Dark Energy Survey Logo



DES Document 6264-v1

Discussion of draft report on DES Calibration Year 1 and Beyond

Document #:
DES-doc-6264-v1
Document type:
Meeting Presentation
Submitted by:
Douglas L Tucker
Updated by:
Douglas L Tucker
Document Created:
13 Apr 2012, 16:12
Contents Revised:
13 Apr 2012, 16:12
Metadata Revised:
13 Apr 2012, 16:12
Viewable by:
  • Public document
Modifiable by:

Quick Links:
Latest Version

Abstract:
Discussion of draft report on DES Calibration Year 1 and Beyond (basically, an update of my "DES Calibrations: Remaining Loose Ends for Year 1" talk I have been giving and updating over the past 2 months during the DES calibrations telecons.
Files in Document:
  • PDF version (DESYear1CalibLooseEnds-v0.1-update-20120417.pdf, 3.7 MB)
  • PPT version (DESYear1CalibLooseEnds-v0.1-update-20120417.ppt, 3.9 MB)
Referenced by:
  • DES-doc-6309: Plan for Calibrating DES Year 1 Data
Associated with Events:
PreCam Special Session, 17 April 2012 held on 17 Apr 2012 in ***The Racetrack Conference Room (WH7X)***
DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]


Security, Privacy, Legal
Fermilab Policy on Computing
 

For assistance contact HelpDesk



DocDB Version 8.8.9, contact Document Database Administrators