Dark Energy Survey Logo



Document List by Topic

These documents on the front end electronics and sub-topics are available:

DES-doc-# Title Author(s) Topic(s) Last Updated
354-v14 12-channel Acquisition Board Manual Jamieson Olsen Electronics
12Ch Acquisition Board
Frontend
17 Dec 2012
4208-v1 Integrated Kapton Cable V3 - Schematic Walter Stuermer Electronics
09 Mar 2012
912-v3 12-Channel ACQ Transition Cables Theresa M Shaw Electronics
09 Mar 2012
916-v7 Clock cables - Mechanical Information Theresa M Shaw Electronics
09 Mar 2012
355-v22 12-channel Acquisition Board Firmware Jamieson Olsen Electronics
12Ch Acquisition Board
Frontend
17 Dec 2010
4242-v1 March 2010 FEE Engineering Run at CTIO and Tololo Steve Chappa Electronics
16 Aug 2010
3818-v1 ESD Hazard and AC Power and Grounding for the 1-meter telescope Steve Chappa Frontend
16 Aug 2010
201-v1 Monsoon Crate 80mm Air Flow Vaidas Simaitis Frontend
24 Oct 2006
1458-v1 DECam - 12 Channel Acquisition Board Acceptance Criteria Scott Holm et al. Electronics
12Ch Acquisition Board
Frontend
23 Apr 2009
1457-v2 DECam 12-Channel Acquisition Board Test Procedures v0.1 Scott Holm et al. Electronics
12Ch Acquisition Board
Frontend
23 Apr 2009
362-v4 12 Channel CCD Acquisition Card Printed Circuit Board David Huffman Electronics
12Ch Acquisition Board
Frontend
01 Apr 2009
361-v3 12 Channel CCD Acquisition Card Schematic (PDF) David Huffman Electronics
12Ch Acquisition Board
Frontend
01 Apr 2009
690-v1 Fermi-12 Channel CCD Acquisition Card Schematic V2 David Huffman Electronics
12Ch Acquisition Board
Frontend
01 Apr 2009
455-v1 Monsoon 12ch 6.5us pixel readout waveform Jamieson Olsen Electronics
16 Feb 2009
1518-v3 AlN_V2.1 Manufactoring Files Theresa M Shaw Frontend
20 Feb 2008
328-v1 Monsoon Crate Insertion Clearance Vaidas Simaitis Telescope
Monsoon
28 Jan 2008
713-v10 Internal cabling - draft schematics for discussion purposes Theresa M Shaw Electronics
04 Oct 2007
609-v1 Crate without power supply Vaidas Simaitis Electronics
14 Sep 2007
611-v2 Power Cone for DHE linear supplies Vaidas Simaitis Electronics
14 Sep 2007
717-v1 FE Electronics - Aug 2, 2007 Status Report Theresa M Shaw Electronics
02 Aug 2007
667-v1 dewar inside photos Theresa M Shaw Electronics
12 Jul 2007
658-v1 8 Channel CCD Acq. Board Video Channel Control Register Definitions Todd C. Moore Electronics
10 Jul 2007
650-v2 FE Electronics report Theresa M Shaw Electronics
03 Jul 2007
648-v1 8-channel Monsoon ACQ Board schematics Peter Moore Electronics
02 Jul 2007
647-v1 Acq Transition Modules Mark Kozlovsky et al. Electronics
02 Jul 2007
645-v1 LBNL CCD Information Natalie Roe Electronics
28 Jun 2007
636-v1 Pre-amplifier Board Example Theresa M Shaw et al. Electronics
26 Jun 2007
635-v1 Kapton Cable Theresa M Shaw et al. Electronics
26 Jun 2007
634-v2 CCD Interface Board Theresa M Shaw et al. Electronics
26 Jun 2007
329-v6 AlN Board - A look at using a flat flex connector with JFET on AlN Theresa M Shaw Electronics
26 Jun 2007
617-v1 FE Status Theresa M Shaw Electronics
21 Jun 2007
610-v1 Power Supplies at far end of cage Vaidas Simaitis Electronics
13 Jun 2007
608-v1 DES DHE Crate System Management & Control Todd C. Moore Electronics
13 Jun 2007
574-v1 Common problems and solutions for Monsoon Engineering Console Walter Stuermer Diagnostics
11 May 2007
607-v2 DES Monsoon Linear Power Supply Selection Todd C. Moore Electronics
12 Jun 2007
600-v6 DES Monsoon Power Cable Voltage Drops Todd C. Moore Electronics
12 Jun 2007
605-v1 Power Supply Status Theresa M Shaw Monsoon
11 Jun 2007
597-v2 DES Monsoon Crate Measured Power Consumption Todd C. Moore Electronics
06 Jun 2007
572-v1 Microsecond Delays on Non-Real Time Operating Systems Robert Angstadt et al. Conference Proceedings
Testing
Monsoon
23 May 2007
582-v1 FEE-power supplies Theresa M Shaw Monsoon
17 May 2007
378-v3 DES Monsoon Power Supply Control System Draft V2.0 Todd C. Moore et al. Frontend
27 Apr 2007
64-v9 Tests of the Vicor Power Supply for the Monsoon Crate Inga Karliner et al. Electronics
20 Apr 2007
451-v2 Monsoon Power Supply Schematic Peter Moore Frontend
04 Apr 2007
386-v1 SZCAM_uiuc_07_03_01.ppt Inga Karliner Electronics
Monsoon
01 Mar 2007
384-v1 FEE Status Theresa M Shaw Electronics
01 Mar 2007
383-v1 Barcelona - SLink Laia Cardiel Monsoon
01 Mar 2007
358-v1 FE Electronics Slide - 12 Channel Board Theresa M Shaw Electronics
15 Feb 2007
340-v1 FE Electronics Status - 01FEB2007 Theresa M Shaw Electronics
01 Feb 2007
338-v1 grounding overview Theresa M Shaw Electronics
31 Jan 2007
333-v1 DES FE Electronics PMG Theresa M Shaw Electronics
25 Jan 2007
331-v1 CCDACQ 12 channel board register summary David Huffman Electronics
25 Jan 2007
319-v1 DES Heater Control - Prototype Design Mark Kozlovsky Electronics
18 Jan 2007
256-v1 DES FE Electronics Status Theresa M Shaw Electronics
10 Dec 2006
244-v3 draft FEE slides for December 2006 Collaboration meeting Theresa M Shaw Frontend
08 Dec 2006
223-v1 16NOV2006 FEE Status Theresa M Shaw Electronics
16 Nov 2006
196-v1 BCN_Slink Laia Cardiel Monsoon
19 Oct 2006
181-v1 Brief Status Report on FE Electronics Theresa M Shaw Electronics
05 Oct 2006
178-v1 UIUC Monsoon Board Info - Calibration files and documentation Todd C. Moore Calibrations
Monsoon
03 Oct 2006
159-v2 Plan for assigning serial numbers for certain front end components Walter Stuermer Electronics
01 Aug 2006
126-v1 WBS 1.3 Director's Review Talk FEE - July 2006 (T. Shaw) Theresa M Shaw Electronics
21 Jul 2006
79-v1 Monsoon Board Power Consumption Todd C. Moore Electronics
Monsoon
14 Jun 2006
68-v1 Vicor Power Supply Status 4-4-06 Todd C. Moore Electronics
05 Apr 2006
66-v1 CBB and CCD Calibration Constants Michael J. Haney et al. Electronics
Monsoon
23 Mar 2006
52-v1 Minutes of Monsoon Software Meeting, 13 Feb 2006 Wyatt Merritt Monsoon
17 Feb 2006
50-v1 UofI Readout Problems Todd C. Moore Monsoon
14 Feb 2006
51-v1 More UofI Readout Problems Todd C. Moore Monsoon
14 Feb 2006
25-v1 Using Leach Juan Estrada Electronics
24 Jan 2006
26-v1 introduction Brenna Flaugher Monsoon
23 Jan 2006
15-v4 Monsoon Software for DES - Status, 23 Jan 06 Michael J. Haney Monsoon
23 Jan 2006
18-v1 Monsoon-Integration Richard Kessler Monsoon
22 Jan 2006
19-v1 Monsoon Reliability and Testing Richard Kessler Monsoon
22 Jan 2006
11-v3 Monsoon Software Status, 9 Jan 2006 Michael J. Haney Monsoon
09 Jan 2006

Number of documents found: 72

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]


Security, Privacy, Legal
Fermilab Policy on Computing
 

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 7 wallclock secs ( 1.03 usr + 0.34 sys = 1.37 CPU)