Dark Energy Survey Logo



Document List by Topic

These documents on PreCAM (subtopic of Calibrations) are available:
(List events on PreCAM)

DES-doc-# Title Author(s) Topic(s) Last Updated
8953-v1 DES Calibrations Telecon Agenda: 4 December 2015 Douglas L Tucker PreCAM
03 Dec 2015
8765-v1 DES Calibrations Telecon Agenda: 7 August 2015 Douglas L Tucker PreCAM
Calibrations
06 Aug 2015
8713-v2 DES Calibrations Telecon Agenda: 19 June 2015 Douglas L Tucker PreCAM
Calibrations
18 Jun 2015
8695-v1 DES Calibrations Telecon Agenda: 5 June 2015 Douglas L Tucker PreCAM
Calibrations
04 Jun 2015
8559-v2 DES Calibrations Telecon Agenda: 8 May 2015 Douglas L Tucker PreCAM
Calibrations
07 May 2015
8540-v1 DES Calibrations Telecon Agenda: 24 April 2015 Douglas L Tucker PreCAM
Calibrations
22 Apr 2015
8519-v1 DES Calibrations Telecon Agenda: 10 April 2015 Douglas L Tucker PreCAM
Calibrations
08 Apr 2015
8503-v1 DES Calibrations Telecon Agenda: 27 March 2015 Douglas L Tucker PreCAM
Calibrations
26 Mar 2015
8449-v1 DES Calibrations Telecon Agenda: 13 February 2015 Douglas L Tucker PreCAM
Calibrations
11 Feb 2015
8430-v1 DES Calibrations Telecon Agenda: 23 January 2015 Douglas L Tucker PreCAM
Calibrations
20 Jan 2015
8414-v2 DES Calibrations/PreCam Telecon Agenda: 9 January 2015 Douglas L Tucker PreCAM
Calibrations
07 Jan 2015
8405-v1 DES Calibrations/PreCam Telecon Agenda: 19 December 2014 Douglas L Tucker PreCAM
Calibrations
17 Dec 2014
8385-v1 DES Calibrations/PreCam Telecon Agenda: 5 December 2014 Douglas L Tucker PreCAM
Calibrations
04 Dec 2014
8376-v1 DES Calibrations/PreCam Telecon Agenda: 21 November 2014 Douglas L Tucker PreCAM
Calibrations
20 Nov 2014
8365-v1 DES Calibrations/PreCam Telecon Agenda: 14 November 2014 Douglas L Tucker PreCAM
Calibrations
13 Nov 2014
8359-v1 DES Calibrations/PreCam Telecon Agenda: 31 October 2014 Douglas L Tucker PreCAM
Calibrations
30 Oct 2014
8180-v1 DES Calibrations/PreCam Telecon Agenda: 10 October 2014 Douglas L Tucker PreCAM
Calibrations
09 Oct 2014
8173-v1 DES Calibrations/PreCam Telecon Agenda: 3 October 2014 Douglas L Tucker PreCAM
Calibrations
02 Oct 2014
8156-v1 DES Calibrations/PreCam Telecon Agenda: 19 September 2014 Douglas L Tucker PreCAM
Calibrations
18 Sep 2014
8143-v1 DES Calibrations/PreCam Telecon Agenda: 5 September 2014 Douglas L Tucker PreCAM
Calibrations
04 Sep 2014
8120-v1 DES Calibrations/PreCam Telecon Agenda: 8 August 2014 Douglas L Tucker PreCAM
Calibrations
06 Aug 2014
8087-v2 DES Calibrations/PreCam Telecon Agenda: 11 July 2014 Douglas L Tucker PreCAM
Calibrations
10 Jul 2014
8041-v1 DES Calibrations/PreCam Telecon Agenda: 13 June 2014 Douglas L Tucker PreCAM
Calibrations
11 Jun 2014
8032-v2 DES Calibrations/PreCam Telecon Agenda: 30 May 2014 Douglas L Tucker PreCAM
Calibrations
28 May 2014
7833-v1 DES Calibrations/PreCam Telecon Agenda: 2 May 2014 Douglas L Tucker PreCAM
Calibrations
01 May 2014
7780-v1 DES Calibrations/PreCam Telecon Agenda: 4 April 2014 Douglas L Tucker PreCAM
Calibrations
02 Apr 2014
7739-v1 Absolute Normalization of the DECal Scan Response Curves Douglas L Tucker PreCAM
Calibrations
27 Feb 2014
7711-v1 DES Calibrations/PreCam Telecon Agenda: 7 February 2014 Douglas L Tucker PreCAM
Calibrations
05 Feb 2014
7659-v2 DES Calibrations/PreCam Telecon Agenda: 10 January 2014 Douglas L Tucker PreCAM
Calibrations
09 Jan 2014
7627-v1 DES Calibrations/PreCam Telecon Agenda: 6 December 2013 Douglas L Tucker PreCAM
Calibrations
05 Dec 2013
7614-v1 DES Calibrations/PreCam Telecon Notes: 22 November 2013 Douglas L Tucker PreCAM
Calibrations
20 Nov 2013
7592-v1 DES Calibrations/PreCam Telecon Agenda: 8 November 2013 Douglas L Tucker PreCAM
Calibrations
06 Nov 2013
7530-v1 DES Calibrations/PreCam Telecon Agenda: 11 October 2013 Douglas L Tucker PreCAM
Calibrations
09 Oct 2013
7388-v1 Global Photometric Calibrations for SV-A1 Douglas L Tucker PreCAM
Calibrations
12 Sep 2013
7387-v1 DES Calibrations/PreCam Telecon Agenda: 13 September 2013 Douglas L Tucker PreCAM
Calibrations
12 Sep 2013
7379-v2 DES Calibrations/PreCam Telecon Agenda: 6 September 2013 Douglas L Tucker PreCAM
Calibrations
04 Sep 2013
7374-v3 DES Calibrations/PreCam Telecon Agenda: 23 August 2013 Douglas L Tucker PreCAM
Calibrations
21 Aug 2013
7357-v1 DES Calibrations/PreCam Telecon Agenda: 9 August 2013 Douglas L Tucker PreCAM
Calibrations
08 Aug 2013
7345-v1 SPTE Calibrations Kyler Kuehn PreCAM
Calibrations
26 Jul 2013
7343-v1 DES Calibrations/PreCam Telecon Agenda: 26 July 2013 Douglas L Tucker PreCAM
Calibrations
25 Jul 2013
7235-v2 Plans for Calibration of Early DES Data and Full Calibration Douglas L Tucker PreCAM
Calibrations
17 Jul 2013
7328-v1 DES Calibrations/PreCam Telecon Agenda: 12 July 2013 Douglas L Tucker PreCAM
Calibrations
11 Jul 2013
7315-v1 Notes from the 14 June 2013 DES-Calibrations Telecon Douglas L Tucker PreCAM
Calibrations
27 Jun 2013
7314-v2 DES Calibrations/PreCam Telecon Agenda: 28 June 2013 Douglas L Tucker PreCAM
Calibrations
27 Jun 2013
7253-v1 Ongoing Calibration Work / Areas Needing Work before Survey Start Douglas L Tucker PreCAM
Calibrations
13 Jun 2013
7277-v1 DES Calibrations/PreCam Telecon Agenda: 24 May 2013 Douglas L Tucker PreCAM
Calibrations
23 May 2013
7252-v1 DES Calibrations/PreCam Telecon Agenda: 3 May 2013 Douglas L Tucker PreCAM
Calibrations
02 May 2013
7223-v1 DES Calibrations/PreCam Telecon Agenda: 19 April 2013 Douglas L Tucker PreCAM
Calibrations
18 Apr 2013
7057-v1 DES Calibrations/PreCam Telecon Agenda: 5 April 2013 Douglas L Tucker PreCAM
Calibrations
04 Apr 2013
7051-v2 DES Calibrations/PreCam Telecon Agenda: 29 March 2013 Douglas L Tucker PreCAM
Calibrations
28 Mar 2013
7050-v1 Draft Agenda for the PreCam Session at the LBNL DES Collaboration Meeting Dave Burke PreCAM
Calibrations
28 Mar 2013
6982-v1 DES Calibrations/PreCam Telecon Agenda: 8 March 2013 Douglas L Tucker PreCAM
Calibrations
07 Mar 2013
6978-v2 DES Calibrations/PreCam Telecon Agenda: 1 March 2013 Douglas L Tucker PreCAM
Calibrations
28 Feb 2013
6976-v1 DES Calibrations/PreCam Telecon Agenda: 22 February 2013 Douglas L Tucker PreCAM
Calibrations
20 Feb 2013
6969-v2 DES Calibrations/PreCam Telecon Agenda: 15 February 2013 Douglas L Tucker PreCAM
Calibrations
14 Feb 2013
6962-v1 DES Calibrations/PreCam Telecon Agenda: 8 February 2013 Douglas L Tucker PreCAM
Calibrations
07 Feb 2013
6958-v1 Star Flat Update (Nicolas Regnault) Non-DES Author PreCAM
Calibrations
01 Feb 2013
6957-v1 DES Calibrations/PreCam Telecon Agenda: 1 February 2013 Douglas L Tucker PreCAM
Calibrations
31 Jan 2013
6949-v1 DES Calibrations/PreCam Telecon Agenda: 25 January 2013 Douglas L Tucker PreCAM
Calibrations
24 Jan 2013
6941-v1 DES Calibrations/PreCam Telecon Agenda: 15 January 2013 Douglas L Tucker PreCAM
Calibrations
17 Jan 2013
6921-v1 DES Calibrations/PreCam Telecon Agenda: 3 January 2013 Douglas L Tucker PreCAM
Calibrations
02 Jan 2013
4295-v2 100mm x 100mm (4in x 4in) DES grizy filter transmissions Darren DePoy PreCAM
Filters
Calibrations
16 Dec 2012
6759-v1 PreCam 2.0 Survey Strategy and Requirements Douglas L Tucker PreCAM
Calibrations
10 Dec 2012
6733-v1 DES Calibrations/PreCam Telecon Agenda: 6 December 2012 Douglas L Tucker PreCAM
Calibrations
05 Dec 2012
6716-v1 DES Calibrations/PreCam Telecon Agenda: 15 November 2012 Douglas L Tucker PreCAM
Calibrations
14 Nov 2012
6711-v1 Photometric calibrations from SV Nights 1 and 2 Douglas L Tucker PreCAM
Calibrations
07 Nov 2012
6710-v1 DES Calibrations/PreCam Telecon Agenda: 8 November 2012 Douglas L Tucker PreCAM
Calibrations
07 Nov 2012
6703-v1 DES Calibrations/PreCam Telecon Agenda: 1 November 2012 Douglas L Tucker PreCAM
Calibrations
31 Oct 2012
6691-v1 DES Calibrations/PreCam Telecon Agenda: 11 October 2012 Douglas L Tucker PreCAM
Calibrations
10 Oct 2012
6686-v1 DES Calibrations/PreCam Telecon Agenda: 4 October 2012 Douglas L Tucker PreCAM
Calibrations
03 Oct 2012
6679-v1 DES Calibrations/PreCam Telecon Agenda: 27 September 2012 Douglas L Tucker PreCAM
Calibrations
26 Sep 2012
6203-v2 Synthetic DES grizY and SDSS ugriz (+UKIDSS Y) AB magnitudes for representative stars Douglas L Tucker PreCAM
Calibrations
18 Sep 2012
6658-v1 DES Calibrations/PreCam Telecon Agenda: 14 September 2012 Douglas L Tucker PreCAM
Calibrations
13 Sep 2012
6649-v1 DES Calibrations/PreCam Telecon Agenda: 7 September 2012 Douglas L Tucker PreCAM
Calibrations
06 Sep 2012
6644-v1 DES Calibrations Telecon Agenda: 31 August 2012 Douglas L Tucker PreCAM
Calibrations
31 Aug 2012
6638-v1 DES Calibrations Telecon Agenda: 24 August 2012 Douglas L Tucker PreCAM
Calibrations
23 Aug 2012
6626-v1 DES Calibrations/PreCam Telecon Agenda: 10 August 2012 Douglas L Tucker PreCAM
Calibrations
09 Aug 2012
6617-v2 DES Calibrations/PreCam Telecon Agenda: 3 August 2012 Douglas L Tucker PreCAM
Calibrations
02 Aug 2012
6609-v1 DES Calibrations/PreCam Telecon Agenda: 27 July 2012 Douglas L Tucker PreCAM
Calibrations
26 Jul 2012
6602-v1 DES Calibrations/PreCam Telecon Agenda: 20 July 2012 Douglas L Tucker PreCAM
Calibrations
19 Jul 2012
6572-v1 DES Calibrations/PreCam Telecon Agenda: 6 July 2012 Douglas L Tucker PreCAM
Calibrations
05 Jul 2012
6569-v1 DES Calibrations/PreCam Telecon Agenda: 29 June 2012 Douglas L Tucker PreCAM
Calibrations
28 Jun 2012
6553-v1 DES Calibrations/PreCam Telecon Agenda: 22 June 2012 Douglas L Tucker PreCAM
Calibrations
21 Jun 2012
6543-v2 DES Calibrations/PreCam Telecon Agenda: 15 June 2012 Douglas L Tucker PreCAM
Calibrations
13 Jun 2012
6538-v1 DES Calibrations/PreCam Telecon Agenda: 8 June 2012 Douglas L Tucker PreCAM
Calibrations
07 Jun 2012
6529-v1 PreCam 1.5 Exposure Times Douglas L Tucker PreCAM
Calibrations
31 May 2012
6528-v3 DES Calibrations/PreCam Telecon Agenda: 1 June 2012 Douglas L Tucker PreCAM
Calibrations
31 May 2012
6524-v1 DES Calibrations/PreCam Telecon Agenda: 25 May 2012 Douglas L Tucker PreCAM
Calibrations
24 May 2012
6517-v1 DES Calibrations/PreCam Telecon Agenda: 18 May 2012 Douglas L Tucker PreCAM
Calibrations
17 May 2012
6368-v1 ZEMAX Analysis of PreCam/Curtis-Schmidt Optics Kyler Kuehn PreCAM
08 May 2012
6302-v1 ANL Processing/Analysis Update Kyler Kuehn PreCAM
27 Apr 2012
6299-v1 DES Calibrations/PreCam Telecon Agenda: 27 April 2012 Douglas L Tucker PreCAM
Calibrations
26 Apr 2012
6268-v1 Goals and Requirements for PreCAM II Douglas L Tucker PreCAM
Calibrations
17 Apr 2012
6265-v1 Photometric Calibration Strategy of the Dark Energy Survey (DES) Douglas L Tucker PreCAM
Calibrations
13 Apr 2012
6264-v1 Discussion of draft report on DES Calibration Year 1 and Beyond Douglas L Tucker PreCAM
Calibrations
13 Apr 2012
6251-v1 ANL Processing/Analysis Update Kyler Kuehn PreCAM
06 Apr 2012
6250-v1 PreCam Global Relative Calibrations for FNALv4 Processing (Update: 6 April 2012) Douglas L Tucker et al. PreCAM
Calibrations
05 Apr 2012
6249-v1 DES Calibrations: Remaining Loose Ends for Year 1 (Update: 6 April 2012) Douglas L Tucker PreCAM
Calibrations
05 Apr 2012
6248-v1 DES Calibrations/PreCam Telecon Agenda: 6 April 2012 Douglas L Tucker PreCAM
Calibrations
05 Apr 2012
6234-v1 DES Calibrations: Remaining Loose Ends for Year 1 (Update: 23 March 2012) Douglas L Tucker PreCAM
Calibrations
23 Mar 2012
6233-v1 DES Calibrations/PreCam Telecon Agenda: 23 March 2012 Douglas L Tucker PreCAM
Calibrations
22 Mar 2012
6218-v1 DES Calibrations/PreCam Telecon Agenda: 9 March 2012 Douglas L Tucker PreCAM
Calibrations
08 Mar 2012
6201-v1 DES Calibrations/PreCam Telecon Agenda: 2 March 2012 Douglas L Tucker PreCAM
Calibrations
01 Mar 2012
6186-v1 DES Calibrations/PreCam Telecon Agenda: 24 February 2012 Douglas L Tucker PreCAM
Calibrations
23 Feb 2012
6180-v1 DES Calibrations/PreCam Telecon Agenda: 17 February 2012 Douglas L Tucker PreCAM
Calibrations
16 Feb 2012
6158-v1 DES Calibrations/PreCam Telecon Agenda: 10 February 2012 Douglas L Tucker PreCAM
Calibrations
09 Feb 2012
6140-v1 DES Calibrations/PreCam Telecon Agenda: 27 January 2012 Douglas L Tucker PreCAM
Calibrations
26 Jan 2012
6136-v1 DES Calibrations/PreCam Telecon Agenda: 20 January 2012 Douglas L Tucker PreCAM
Calibrations
19 Jan 2012
6111-v1 DES Calibrations/PreCam Telecon Agenda: 6 January 2012 Douglas L Tucker PreCAM
Calibrations
05 Jan 2012
6080-v1 DES Calibrations/PreCam Telecon Agenda: 16 December 2011 Douglas L Tucker PreCAM
Calibrations
15 Dec 2011
6072-v1 DES Calibrations/PreCam Telecon Agenda: 9 December 2011 Douglas L Tucker PreCAM
Calibrations
08 Dec 2011
6060-v1 PreCam Exposure Times Douglas L Tucker PreCAM
Calibrations
01 Dec 2011
6059-v1 PreCam Focus Douglas L Tucker et al. PreCAM
Calibrations
01 Dec 2011
6058-v1 DES Calibrations/PreCam Telecon Agenda: 2 December 2011 Douglas L Tucker PreCAM
Calibrations
01 Dec 2011
6044-v3 PreCam Processing & Analysis Update Kyler Kuehn PreCAM
18 Nov 2011
6042-v1 DES Calibrations/PreCam Telecon Agenda: 18 November 2011 Douglas L Tucker PreCAM
Calibrations
17 Nov 2011
6018-v1 PreCam and Global Calibrations Douglas L Tucker et al. PreCAM
Calibrations
27 Oct 2011
6017-v1 DES Calibrations/PreCam Telecon Agenda: 28 October 2011 Douglas L Tucker PreCAM
Calibrations
27 Oct 2011
6009-v1 ANL Processing Update Kyler Kuehn PreCAM
21 Oct 2011
6005-v1 DES Calibrations/PreCam Telecon Agenda: 21 October 2011 Douglas L Tucker PreCAM
Calibrations
20 Oct 2011
5975-v1 DES Calibrations/PreCam Telecon Agenda: 14 Octber 2011 Douglas L Tucker PreCAM
Calibrations
12 Oct 2011
5928-v1 FNAL/ANL Processing & Analysis of PreCam Data Kyler Kuehn PreCAM
10 Oct 2011
5826-v1 DES Calibrations/PreCam Telecon Agenda: 23 September 2011 Douglas L Tucker PreCAM
Calibrations
22 Sep 2011
5474-v4 Calibration Plan for Early DES Data Douglas L Tucker PreCAM
Calibrations
14 Sep 2011
5806-v1 DES Calibrations/PreCam Telecon Agenda: 9 September 2011 Douglas L Tucker PreCAM
Calibrations
08 Sep 2011
5802-v1 SDSS_DR8_WD J. Allyn Smith PreCAM
Calibrations
02 Sep 2011
5801-v1 Seeing is Believing: Why PreCam is out of Focus!! Sahar S. Allam PreCAM
Calibrations
02 Sep 2011
5799-v1 DES Calibrations/PreCam Telecon Agenda: 2 September 2011 Douglas L Tucker PreCAM
Calibrations
01 Sep 2011
5792-v1 Optimizing Aperture Photometry for PreCam: FWHM Cuts Douglas L Tucker PreCAM
Calibrations
26 Aug 2011
5788-v1 DES Calibrations/PreCam Telecon Agenda: 26 August 2011 Douglas L Tucker PreCAM
Calibrations
25 Aug 2011
5781-v3 FNALv3 Reductions Astrometry Status Hope Head et al. PreCAM
Calibrations
18 Aug 2011
5777-v1 DES Calibrations/PreCam Telecon Agenda: 17 August 2011 Douglas L Tucker PreCAM
Calibrations
18 Aug 2011
5763-v1 DES Calibrations/PreCam Telecon Agenda: 12 August 2011 Douglas L Tucker PreCAM
Calibrations
11 Aug 2011
5755-v2 Dipole Analysis for PreCam Data Kyler Kuehn PreCAM
05 Aug 2011
5751-v1 DES Calibrations/PreCam Telecon Agenda: 5 August 2011 Douglas L Tucker PreCAM
Calibrations
04 Aug 2011
5750-v1 PSF-Fitting Photometry for PreCam Douglas L Tucker et al. PreCAM
Calibrations
04 Aug 2011
5720-v1 DES Calibrations/PreCam Telecon Agenda: 22 July 2011 Douglas L Tucker PreCAM
Calibrations
21 Jul 2011
5707-v1 DES Calibrations/PreCam Telecon Agenda: 15 July 2011 Douglas L Tucker PreCAM
Calibrations
14 Jul 2011
5696-v1 DES Calibrations/PreCam Telecon Agenda: 8 July 2011 Douglas L Tucker PreCAM
Calibrations
07 Jul 2011
5685-v1 Calibration and Precam Douglas L Tucker PreCAM
Calibrations
30 Jun 2011
5622-v1 FNAL-ANL PreCam Reductions Douglas L Tucker PreCAM
Calibrations
29 Jun 2011
5595-v1 DES Calibrations/PreCam Telecon Agenda: 24 June2011 Douglas L Tucker PreCAM
Calibrations
23 Jun 2011
5585-v1 DES Calibrations/PreCam Telecon Agenda: 17 June2011 Douglas L Tucker PreCAM
Calibrations
23 Jun 2011
5580-v1 DES Calibrations Telecon Notes: 10 June 2011 Douglas L Tucker PreCAM
Calibrations
10 Jun 2011
5050-v1 Calibration and PreCam Douglas L Tucker PreCAM
Calibrations
10 Jun 2011
5495-v6 PreCam Results & Plans Douglas L Tucker PreCAM
Calibrations
10 Jun 2011
5577-v1 Steps for Processing and Analyzing PreCam Data Douglas L Tucker PreCAM
Calibrations
09 Jun 2011
5576-v1 DES Calibrations/PreCam Telecon Agenda: 10 June2011 Douglas L Tucker PreCAM
Calibrations
09 Jun 2011
5563-v1 DES Calibrations/PreCam Telecon Agenda: 27 May 2011 Douglas L Tucker PreCAM
Calibrations
26 May 2011
5554-v1 DES Calibrations/PreCam Telecon Agenda: 20 May 2011 Douglas L Tucker PreCAM
Calibrations
19 May 2011
5547-v1 DES Calibration Fields Douglas L Tucker Survey Design
PreCAM
Supernova
Calibrations
16 May 2011
5507-v1 DES Calibrations/PreCam Telecon Agenda: 6 May 2011 Douglas L Tucker PreCAM
Calibrations
05 May 2011
5472-v1 DES Calibrations/PreCam Telecon Agenda: 29 April 2011 Douglas L Tucker PreCAM
Calibrations
28 Apr 2011
5456-v1 DES Calibrations/PreCam Telecon Agenda: 22 April 2011 Douglas L Tucker PreCAM
Calibrations
21 Apr 2011
5443-v1 DES Calibrations/PreCam Telecon Agenda: 15 April 2011 Douglas L Tucker PreCAM
Calibrations
14 Apr 2011
5419-v1 PreCam's Progress Douglas L Tucker PreCAM
Calibrations
08 Apr 2011
5414-v2 DES Calibrations/PreCam Telecon Agenda: 8 April 2011 Douglas L Tucker PreCAM
Calibrations
07 Apr 2011
5404-v1 PreCam data analysis at Fermilab Douglas L Tucker PreCAM
Calibrations
01 Apr 2011
5403-v1 DES Calibrations/PreCam Telecon Agenda: 1 April 2011 Douglas L Tucker PreCAM
Calibrations
01 Apr 2011
5388-v1 PreCam Astrometry/Photometry Update: 25 March 2011 Sahar S. Allam et al. PreCAM
Calibrations
25 Mar 2011
5385-v2 DES Calibrations/PreCam Telecon Agenda: 25 March 2011 Douglas L Tucker PreCAM
Calibrations
24 Mar 2011
5374-v1 PreCam Astrometry/Photometry Update Douglas L Tucker PreCAM
Calibrations
18 Mar 2011
5373-v1 PreCam Lessons Learned: Software (2011-03-18) Kyler Kuehn PreCAM
17 Mar 2011
5371-v2 DES Calibrations/PreCam Telecon Agenda: 18 March 2011 Douglas L Tucker PreCAM
Calibrations
17 Mar 2011
5356-v1 DES Calibrations/PreCam Telecon Agenda: 11 March 2011 Douglas L Tucker PreCAM
Calibrations
10 Mar 2011
5343-v1 March 4, 2011 PreCam Astrometry Update for the Night of 2011-01-13 UT Douglas L Tucker PreCAM
Calibrations
04 Mar 2011
5338-v1 DES Calibrations/PreCam Telecon Agenda: 4 March 2011 Douglas L Tucker PreCAM
Calibrations
03 Mar 2011
5325-v1 PreCam Astrometry Update from the Night of 2011-01-13UT Douglas L Tucker PreCAM
Calibrations
25 Feb 2011
5322-v1 DES Calibrations/PreCam Telecon Agenda: 25 February 2011 Douglas L Tucker PreCAM
Calibrations
24 Feb 2011
5305-v1 DES Calibrations/PreCam Telecon Agenda: 18 February 2011 Douglas L Tucker PreCAM
Calibrations
17 Feb 2011
5285-v2 Raw PreCam Astrometry from the Night of 2011-01-13 UT Douglas L Tucker PreCAM
Calibrations
17 Feb 2011
5292-v1 DES Calibrations Telecon Notes: 11 February 2011 Douglas L Tucker PreCAM
Calibrations
11 Feb 2011
5291-v1 PreCam Data Mini-Workshop Report Douglas L Tucker PreCAM
Calibrations
11 Feb 2011
5288-v1 DES Calibrations/PreCam Telecon Agenda: 11 February 2011 Douglas L Tucker PreCAM
Calibrations
08 Feb 2011
5275-v1 Bias over scan test Sahar S. Allam PreCAM
04 Feb 2011
5274-v1 Notes: By-Eye Examination of PreCam 2011-01-13UT Reduced Images Douglas L Tucker PreCAM
Calibrations
04 Feb 2011
5260-v1 PreCam Flat Field QA Sahar S. Allam et al. PreCAM
04 Feb 2011
5270-v1 DES Calibrations/PreCam Telecon Agenda: 4 February 2011 Douglas L Tucker PreCAM
Calibrations
03 Feb 2011
5259-v1 PreCam Analysis Plans Douglas L Tucker PreCAM
Calibrations
27 Jan 2011
5258-v1 Overview of the Nov-Jan PreCam Observing Run Douglas L Tucker PreCAM
Calibrations
27 Jan 2011
5257-v1 PreCam: Lessons Learned Kyler Kuehn PreCAM
27 Jan 2011
5256-v1 PreCam Observing Run Wrap-up Agenda, 27 Jan 2011 Douglas L Tucker PreCAM
Calibrations
26 Jan 2011
5063-v7 Nov 2010-Jan 2011 PreCam Observing Schedule Douglas L Tucker PreCAM
Calibrations
28 Dec 2010
5110-v1 DES Calibrations Telecon Agenda: 18 November 2010 Douglas L Tucker PreCAM
Calibrations
17 Nov 2010
5089-v1 DES Calibrations Telecon Notes: 11 November 2010 Douglas L Tucker PreCAM
Calibrations
10 Nov 2010
5074-v1 DES Calibrations Telecon Notes: 4 November 2010 Douglas L Tucker PreCAM
Calibrations
04 Nov 2010
5070-v1 DES Calibrations Telecon Agenda: 4 November 2010 Douglas L Tucker PreCAM
Calibrations
02 Nov 2010
5055-v1 DES Calibrations Telecon Agenda: 28 October 2010 Douglas L Tucker PreCAM
Calibrations
26 Oct 2010
5003-v1 PReCam Software Status: 2010-10-20 Kyler Kuehn PreCAM
20 Oct 2010
4839-v1 PreCam Focus Movie Sahar S. Allam PreCAM
31 Aug 2010
4803-v1 DES Calibrations Telecon Notes: 19 Aug 2010 Douglas L Tucker PreCAM
Calibrations
22 Aug 2010
4765-v1 PreCam Hardware Update: 2010-08-05 Kyler Kuehn PreCAM
Calibrations
05 Aug 2010
4047-v5 PreCam Observing Proposal John Peoples et al. PreCAM
Calibrations
30 Jul 2010
4720-v1 PreCam Hardware Update: 2010-07-22 Kyler Kuehn PreCAM
Calibrations
22 Jul 2010
4467-v1 Calibration and PreCam Douglas L Tucker PreCAM
Calibrations
05 May 2010

Number of documents found: 195

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ]


Security, Privacy, Legal
Fermilab Policy on Computing
 

For assistance contact HelpDesk



DocDB Version 8.7.23, contact Document Database Administrators
Execution time: 2 wallclock secs ( 0.51 usr + 0.12 sys = 0.63 CPU)